Description
DIRECTIONS
• Shake aerosol can well before use. Stir or mix bulk product to break its paraffin structure
before dipping or brushing applications.
• Mask area not to be treated. If necessary, remove by solvent cleaners (CRC Fast Dry
Degreaser, CRC Industrial Degreaser…).
• Film thickness may be adjusted by thinning with petroleum solvents, but corrosion
resistance varies with film thickness (see typical properties).
• For applications in wet or very humid conditions, CRC 3-36 should be applied first for
complete moisture displacement. Allow then 2 to 4 hours for solvent evaporation before SP
400 is applied.
• When finished spraying, clean aerosol valve by turning can upside down and pressing
actuator until only propellant escapes.
• Do not use on energized equipment. Use in well ventilated areas.


